1 business day
Feasibility
You send a reference, market, quantity, pack idea and logo files if you have them. You get which route applies: color, logo, box language, or extra review.
OEM and private label
Usually available: color change, logo, color-box language and carton marks. New molds, electronics and licensed characters need a separate review. The quote states the route for the selected SKU.

We start from a product you can hold or photograph, not from a slogan. Color, logo and packing are confirmed on that SKU. If a change needs a new mold, electronics work or a licensed character, it is flagged before you spend sample money.
The first reply names the route: ready product with a color change, logo on an existing tool, a private-label color box, or a longer development path. Repeat orders use the locked specification, not a new conversation from zero.
Each step has an input and an output. Artwork is not started until the product and pack format are agreed.
1 business day
You send a reference, market, quantity, pack idea and logo files if you have them. You get which route applies: color, logo, box language, or extra review.
3–20 working days
Stock sample 3–7 days. Color or packaging sample 7–12. New development 12–20. You receive a physical sample and a written change list.
After sample approval
Vector or PDF logo, warnings, barcode and language go on the box and carton marks. Production does not start on an open artwork file.
15–40 days
Ready path typically 15–30 days after approval. Custom path 25–40 days. Incoming, in-line and pre-shipment checks follow the locked spec.
Faster than round one
Same specification, next quantity. Color, logo method and box language stay on file so the second season does not restart sampling.

The quote states which of these apply to the selected SKU. Typical working ranges are a starting point, confirmed per project.
Typically 500–1,000 pcs per color, after sample approval.
Pad print, sticker, hangtag or woven label, confirmed against the product surface.
Typically from 1,000 pcs per color, including warnings and barcode.
Shipping marks, item codes and packing data for the destination.
Fewer or extra parts when the mold and case pack allow it.
Window box, color box, blister or display box, discussed against cost and shelf need.
These are not refused by default. They are not promised in the first reply either.
Tooling, sample rounds and a longer development calendar.
Lights, sound, radio or battery changes need a separate feasibility check.
Only with the buyer’s IP authorization on file.
Construction, small parts and testing must support the claim.
Ranges are a starting point. The quotation states the applicable SKU conditions.
| Step | Typical timing | Buyer delivers |
|---|---|---|
| Feasibility and quote | 1 business day after a complete brief | Reference, market, quantity, pack, logo files |
| Stock sample | 3–7 working days | SKU and delivery country |
| Color or packaging sample | 7–12 working days | Pantone / artwork / language |
| New development sample | 12–20 working days | Sketch, photo or physical reference |
| Bulk after approval | 15–30 days ready; 25–40 days custom | Signed specification |
A complete brief gets a first reply in one business day. Missing files delay artwork, not the first range discussion.
No. A sketch or reference is enough for the first range and cost direction. Vector files are needed before packaging artwork.
No. Some surfaces, fabrics and safety parts are not printable. We confirm the method on the selected SKU.
No. Water-play products are not life-saving equipment.
Next step